← Gallery
[ 12 photos ]
Construction of Drainage at Kadiri Street
In a proactive effort to address flooding and improve environmental sanitation, the administration has undertaken the construction of a functional drainage system along Kadiri Street. This intervention is designed to ensure proper channeling of stormwater, prevent erosion, and enhance the overall durability of the road infrastructure, thereby improving accessibility and the quality of life for residents in the area.
12 April 2026












